Procurement - RFQ Best Practices
RFQ Best Practices: A Guide to Streamlined Supplier Communication
Introduction
A well-organized Request for Quote (RFQ) saves time for everyone involved in the procurement process. When suppliers receive clear, consistent documentation with complete specifications, they can focus on producing accurate quotes rather than sorting through disorganized files or requesting clarifications that delay timelines.
A structured RFQ benefits both sides: buyers receive comparable quotes more quickly, while suppliers can allocate resources efficiently and offer more competitive pricing. This guide outlines best practices for creating comprehensive RFQs that support clear communication, faster decision-making, and better sourcing outcomes.
Summary Sheet
Include a one-page summary sheet (PDF) listing all included files and key project details. This document serves as a single reference point and checklist throughout the quoting process. At minimum, include project name, part numbers and descriptions, quantities, required delivery dates, and a complete file list with revision levels. A clear summary minimizes back-and-forth and ensures nothing critical is missed.
Engineering Drawings and CAD Models
Provide a complete 2D drawing with dimensions, tolerances, GD&T callouts, and section views. Supplement with a 3D model (STEP, IGES, or SolidWorks) to provide spatial context and support automated quoting. Always include revision dates or version numbers, and confirm 2D and 3D files are fully aligned. If changes were made recently, clearly note what changed.
Material Specifications
Specify the required material grade and applicable standards (ASTM, ISO, DIN). Include performance requirements such as strength, corrosion resistance, temperature tolerance, or conductivity, and state whether certifications or MTRs are required. If alternates are acceptable, note them (e.g., 304 instead of 316 in non-corrosive environments) so suppliers can propose cost-effective substitutes.
Manufacturing Process Requirements
List all required processes, preferably in sequence—primary fabrication (laser, stamping, forming, casting) and secondary operations (heat treat, CNC machining, welding, surface treatment, testing). Call out mandatory steps versus optional methods so suppliers can propose alternatives that may improve cost or lead time.
Surface Finish and Coating Details
Specify coating or finish type (powder, anodizing, plating, chromate), color standards (RAL, Pantone, custom), gloss/texture, and durability requirements (e.g., salt spray hours). If only certain areas need cosmetic finishing, mark them on the drawing; allowing non-visible surfaces to remain unfinished can reduce cost.
Quantity and Lead Time
State whether quantities are prototype, low-volume, or full production. Include estimated annual volumes and required delivery timelines, noting whether dates are firm or flexible. Quantity drives process choice and tooling investment; a run of 10 parts differs from 10,000.
Performance and Quality Requirements
Define critical tolerances and inspection features, mechanical or load-bearing requirements, cosmetic versus non-visible zones, and environmental or corrosion needs. Include required certifications, inspection reports, or testing protocols. If FAI or specific measurement methods are required, state them explicitly.
Application Context
Describe how the part functions within the assembly and the operating environment (temperature, chemicals, UV, moisture). Safety-critical or regulated components often require added documentation, traceability, and quality controls. Sharing context lets suppliers flag risks early and suggest suitable methods.
Specification Flexibility
Identify where tolerances or finishes can be relaxed without affecting performance. Overly tight blanket requirements raise cost and lead time. For example, widening a tolerance or relaxing surface roughness on non-functional areas can remove secondary operations and shorten lead time.
Budget Transparency
Share budget targets or cost constraints to encourage collaboration. When suppliers know your cost objectives, they can propose design, material, or process alternatives that meet functional needs while hitting price goals. Invite value engineering suggestions for cost-sensitive parts.
Request DFM Feedback
Use the RFQ to solicit Design for Manufacturability input. Suppliers can flag sharp internal corners, tight bend radii, or features that drive tooling cost, and suggest geometry changes or part consolidation that reduce cost and improve quality.
Clear Communication and Contacts
Designate a primary contact with decision authority and provide full contact details and preferred channels. Set response timelines and availability for technical discussions or site visits. If multiple internal teams review quotes, outline the approval process and expected timeline.
Packaging and Shipping Requirements
Specify packaging to prevent transit damage (individual wrapping, separators, custom crates) and labeling for traceability. Clarify shipping terms (FOB origin/destination, DDP), delivery location, and any required carriers to ensure accurate freight pricing.
Quote Comparison Framework
Request that suppliers structure quotes consistently to enable side-by-side comparison. Include material type and thickness, fabrication processes with individual costs, surface finishing or coating costs, tooling or setup fees, packaging and logistics costs, and lead time and payment terms. Standardized quotes reveal cost drivers quickly and support informed negotiations.
Summary
Investing time in a thorough RFQ reduces quote cycles, improves pricing accuracy, and strengthens supplier relationships. Clear documentation, complete specifications, and transparent communication eliminate guesswork, enabling competitive, realistic quotes with fewer revisions and delays.
By following these best practices, you establish a strong foundation for efficient procurement and successful product development.